1. Program/Design/Construction/Acceptance.
  2. CFD analysis.
  3. ATS/NETA ATS 2017
  4. Studies – SCCS, Arc Flash Study, Root Cause Analysis and Power Quality Analysis.
  5. Level 1 – Factory Witness Testing.
  6. Level 2 – Site Acceptance Inspection.
  7. Level 3 – Pre-Functional Testing and Start up.
  8. Level 4 – Functional Performance Testing.
  9. Level 5 – IST – Integrated Systems Testing.